Clearing Construction Machinery from the UK — Documents, T1 and Costs 2026

Clearing Construction Machinery from the UK — Documents, T1 and Costs 2026

Clearing Construction Machinery from the UK — Documents, T1 and Costs 2026

Importing construction machinery from the United Kingdom — excavators, loaders, cranes, compressors — is one of the most common cases our clients bring us. Since Brexit, every machine needs full customs clearance. Below are answers to the most common questions.

Questions and answers — construction machinery UK → Poland

Which construction machines are most often brought in from the UK?

  • Excavators (wheeled, tracked) — HS 8429 51–59
  • Wheel loaders — HS 8429 51
  • Cranes — HS 8426
  • Compressors — HS 8414
  • Scaffolding and formwork — HS 7308 / 9406
  • Generator sets — HS 8502
  • Forklift trucks — HS 8427

The HS code determines the duty rate — always check it in the TARIC database before buying.

How does customs clearance of a machine from the UK work, step by step?

  1. Preparing the documents — invoice, packing list, CE certificate, EUR.1
  2. ENS + GMR — the customs agency lodges the ENS in the UK and generates a GMR for the driver
  3. Transport and the border — the driver presents the GMR when entering the UK port
  4. T1 (if in transit) — opened at the point of entry into the EU, e.g. Hamburg/Calais
  5. SAD import declaration — the agency lodges it in PUESC and calculates duty and VAT
  6. Release of the goods — the office confirms release, and the machine can go to your warehouse

Can I go and collect the machine from the UK with my own trailer?

Yes — but as the driver, you need to take care of:

  • The export customs declaration in the UK (a UK customs agency) — before leaving the UK
  • A GMR for your vehicle in the GVMS system
  • An import MRN from a customs agency in Poland — once you're back in Poland
  • Insurance for the machine during transport

For self-collection, a power of attorney for a customs agency on both sides is usually required. Contact easyclearance.pl before you set off — we handle the complete process.

How much does clearing a construction machine cost?

We set the cost of handling by a customs agency individually — ask for a quote. For a machine worth PLN 100,000: duty at 0% (with EUR.1) or PLN 2,700 (without EUR.1), VAT at 23% of about PLN 23,621–24,242. Send the machine's specification to easyclearance.pl and get an exact calculation.

Agencja Celna UK team

Written by a customs agency registered with CDS (UK EORI), based on gov.uk, HMRC, the EU customs tariff (TARIC) and Polish law. This article is for information only — check the current rules before clearance or ask us about your situation.

Related guides

Have a similar case? Ask a customs agency

Describe the goods or vehicle, the route and timing. We reply on working days, usually the same day.

Please enter your name.
Please enter a valid email address.
We can call you back fastest on a UK or Polish number.
Please choose a topic.
Please write a few words about your case (at least 10 characters).
We need your consent to be able to reply.

We reply on working days, usually the same day.

Free initial quote

Goods, a vehicle or a house move crossing the UK–EU border?

Tell us what you are moving and where. We will tell you which documents you need, how long clearance takes and what to avoid — in plain language.

WhatsApp